harmony

manpower

“Harmony” will fund 4 Ph.D. students and 5 Post Docs (2 Year each). The Principal Investigator will overall be in charge of the project being responsible to achieve goals/milestones and he will supervise some of the Ph.D. students and Post Docs. The two collaborators will provide guidance to the Ph.D. students and contribute with related activities, which they have in their own research portfolio.

WP1: Modelling of power electronics based power systems

Task 1.1 Modeling of power system components

(Period: April 2013 -)

 

Task 3.2 Stability of large scale power electronic system (PhD)

(Period: June 1st 2015 - May 31st 2018)

WP2: Harmonic analysis and mitigation

Task 2.1 Harmonic system analysis of generators and loads

(Period: December 1, 2013 - November 30 2016)

Task 2.2 Advanced analysis of power system harmonics

(Period: December 1, 2015 -)

Task: Stability of Grid Synchronization and Power Control of Grid Converters for Renewable Energy Systems

(Period: December 1, 2014 -)

Task: Active Damper for Power Electronic Systems

(Period: December 1 2014 -)

Task: Harmonic Stability in Renewable Power Plants

(Period: December 1, 2014 -)

WP3: Stability and system assessment

Task 3.1 Small scale harmonic power system stability

(Period: November 1, 2013 - October 31 2016)

Task 3.2 Stability of large scale power electronic system (PhD)

(Period: June 1st 2015 - May 31st 2018)

Team members